               Timing and What to Expect
               Any construction process is at risk for unexpected delays because of weather, permitting and many
               other factors — it's the nature of the beast!
               But your pool design, construction and maintenance company should be able to give you a pretty
               good timeline with all the steps you can expect.
               Here's a look at a basic rundown of the swimming pool construction process:
                                                                               masonry,
                       Contractor  submits  a  timeline  for  your
                                                                         Install
                                                                                        tile,
                                                                                                   etc.
                                                                                            coping,
                                                                                                       around
                1
                                                                   6
                       swimming
                                                                         pool.
                                   pool
                                                   including
                                         project,
                       projected completion dates.
                                                                   7
                     Secure permits from the necessary city and
                2
                                                                         Install pumps and filtration equipment.
                     municipal departments.
                                                                   8
                                                                         Install  pool  patio,  plantings,  fencing,
                     Begin excavation and rough grading for all
                3
                                                                         irrigation, lighting, etc.
                     pool areas, including patio and flower beds.
                                                                   9
                                                                         Plaster pool and fill with water.
                     Get  building!  Install  framing  and plumbing
                4
                     fixtures (and steel framing for vinyl pools).
                     Install  gunite  shell  or,  for  vinyl  pools,  floor
                                                                         Balance  chemicals  and  finalize  opening
                                                                  10
                5
                     and liner.
                                                                         prep while running final inspection.