Page 9 - Neave Pool Swimming Pool Design Guide
P. 9
Swimming Pool Design Guide
9
Timing and What to Expect
Any construction process is at risk for unexpected delays because of weather, permitting and many
other factors — it's the nature of the beast!
But your pool design, construction and maintenance company should be able to give you a pretty
good timeline with all the steps you can expect.
Here's a look at a basic rundown of the swimming pool construction process:
masonry,
Contractor submits a timeline for your
Install
tile,
etc.
coping,
around
1
6
swimming
pool.
pool
including
project,
projected completion dates.
7
Secure permits from the necessary city and
2
Install pumps and filtration equipment.
municipal departments.
8
Install pool patio, plantings, fencing,
Begin excavation and rough grading for all
3
irrigation, lighting, etc.
pool areas, including patio and flower beds.
9
Plaster pool and fill with water.
Get building! Install framing and plumbing
4
fixtures (and steel framing for vinyl pools).
Install gunite shell or, for vinyl pools, floor
Balance chemicals and finalize opening
10
5
and liner.
prep while running final inspection.